Your cart is empty.

- Quick View
- Choose Options
To implant a spinal cord stimulator two incisions are made over L1-2 and the right buttock. The stimulator lead is placed into the epidural space while the generator is placed into the right buttock, and the two are connected through a subcutaneous tunnel.
Please call 1-888-999-0410 for custom sizing and other options. Need it now? Click here to purchase download.